Garden planning, made simple

Concrete Slab Calculator: How Much Concrete Do I Need?

Work out the concrete for a slab, pad or walkway from length, width and thickness. Get cubic yards, cubic meters and how many 40, 60 or 80 lb bags.

Measure. Calculate. Grow.US & metric units.
Clear quantities. Less guesswork.

Your concrete slab

Measure the slab, then choose its thickness.

Measurement units
ft
ft
in

Yield used: 0.60, 0.45 and 0.30 ft³ per bag. Check the label.

For spills, uneven ground or a spare.

Updates as you type

Measure the right space

Use inside dimensions. Divide irregular spaces into smaller rectangles.

Whole bags, every time

Bag counts round up from the full calculation, never the displayed volume.

A useful starting point

Allow for settling and check your supplier’s product and delivery details.

A few useful answers

A better estimate starts with good measurements.

Here’s how the numbers work, and what to check before placing an order.

How is the concrete volume calculated?

Length × width × thickness, all in the same unit. In US units, divide the thickness in inches by 12 to get feet. Divide cubic feet by 27 to get cubic yards. In metric, one cubic foot is 0.028316846592 m³.

How many bags of concrete do I need for a 10 × 10 ft slab?

At 4 inches thick the slab holds 33.3 ft³. With 10% extra the order is 36.7 ft³ (1.36 yd³), which is 62 bags of 80 lb at about 0.6 ft³ per bag. Without extra it is 56 bags.

Why does the calculator add extra concrete?

Forms rarely sit perfectly level, the ground is not perfectly flat, and some mix is lost in the barrow or the mixer. The allowance menu lets you add 5% to 15%. The default is 10%, which is a common planning habit, not a rule.

When should I order ready-mix instead of bags?

Bags suit small jobs. Mixing many dozens of bags by hand is slow and the batches vary. Many people compare ready-mix once the job reaches a yard or more. Delivery companies often have minimum loads and short-load fees, so ask for their rules.

Does this include rebar, gravel base or reinforcement?

No. The calculator covers the concrete itself. The base layer under a slab is a separate material, and you can estimate it with the gravel calculator.

How to calculate concrete for a slab, pad or walkway

A slab is a rectangular box. Its volume is length times width times thickness. If your measurements are in feet and inches, turn the thickness into feet first by dividing by 12. A 10 ft by 10 ft slab that is 4 inches thick is 10 × 10 × 0.333, which gives 33.3 cubic feet, or 1.23 cubic yards.

Concrete is sold two ways. Ready-mix trucks sell by the cubic yard, often in quarter-yard steps. Bagged mix is sold by weight, and each bag makes a known volume. Common bag yields are about 0.30 cubic feet for 40 lb, 0.45 for 60 lb and 0.60 for 80 lb. Always check the number printed on the bag you buy, because brands differ a little. Divide your volume by the yield and round up once at the end.

Example: a 10 × 10 ft slab, 4 inches thick, plus 10% extra needs 36.7 ft³. That is 1.36 cubic yards, or 62 bags of 80 lb.

Choosing a thickness

Thickness depends on the use and on local building rules, so the calculator does not pick it for you. Light-duty slabs such as small patios and walkways are commonly poured around 4 inches thick. Anything that carries vehicles, or sits on poor soil, can need more. Ask your local building office or a contractor if you are unsure.

Concrete needed per 100 ft² of slab (no extra allowance)
ThicknessCubic feetCubic yards80 lb bags (0.6 ft³)
3 in25.00.9342
4 in33.31.2356
5 in41.71.5470
6 in50.01.8584

Before you pour

Measure the finished slab, not the hole. Add the pieces together if the shape is an L or a T, by splitting it into rectangles. Remember that the base material under the slab, any footings, and any thickened edges are extra. Check the weather and the mixing time too, since a large pour is easier to finish when it arrives all at once.

Need a gravel base under the slab? Use the gravel calculator